Subpage 1:

Leverage unplanned downtime

Print
Issue:

Frequent machine breakdown at client’s palm oil factory.

Problem statement:

Estimate capacity of the conveyor within capacity limit.​

Summary:

Before GENiE, the client was spending $80,000-$100,000 annually on unscheduled maintenance costs and their production output met the average industry standard.
After GENiE was installed, it started monitoring the production line and sent alerts if the conveyor was overloaded. He no longer has any breakdowns, zero unscheduled maintenance and has increased $500,000 profits by the increased amount of production output.